Call Now — Free Estimate: 📞 (877) 349-1553 24/7
EMERGENCY STORM REPAIR info@davisroofingandmaintenance.com
(877) 349-1553
Home Services All Services Roof Replacement Roof Repair Storm Damage Repair New Roof Installation Metal Roofing Shingle Roofing Flat Roofing Commercial Roofing Gutter Installation Roof Inspection Emergency Roof Repair Skylight Installation About Locations All Locations Shirley, MA Thorndike, MA West Wareham, MA Ashley Falls, MA Canton, MA East Bridgewater, MA Groveland, MA Leeds, MA Monponsett, MA Reviews Contact (877) 349-1553
★★★★★ 5 Stars · 401+ Reviews

New Roof Installation | Huntington, MA

Same-Day Appointments Available  ·  24/7 Emergency Service

Full-Service Roofing in Huntington. Huntington Roofing & Maintenance — 5-Star Rated, 401+ Reviews.

Call (877) 349-1553
📞 (877) 349-1553

Storm damage? We deploy tarps and temporary repairs within hours.

Same-Day Service Licensed & Insured Free Estimates
<60 Min
Response Time
19+
Years Experience
5
Star Rating
401+
Happy Reviews

New construction means we start with a clean deck and build the roofing system properly from the first layer. Huntington Roofing & Maintenance has installed new roofs on hundreds of new builds across Huntington, from custom homes to spec builds, from room additions to detached structures.

Our New Roof Installation Process

1

Plan Review & Consultation

We analyze your plans for pitch, square footage, ventilation needs, and code compliance. You get a detailed proposal with material specs, timeline, and fixed pricing before any work begins.

2

Preparation

Materials delivered and staged on-site the day before installation. Shingle pallets, underlayment rolls, flashing stock, ridge vent, and fasteners, everything confirmed against the project spec sheet.

3

Expert Installation

Our Huntington crew installs every layer to manufacturer specifications: underlayment, ice and water shield, drip edge, starter strip, field material, hip and ridge caps, and ventilation. Every fastener placed per the manufacturer nailing schedule.

4

Final Inspection

We schedule the building inspection and walk the roof with the inspector. Your manufacturer warranty gets registered the same day the roof passes inspection. You receive warranty paperwork within a week.

What Huntington Customers Say

★★★★★ 5/5 from 401+ reviews
★★★★★

"Responded fast and got the job done right the first time. Crew was polite, professional, and cleaned up everything. Would absolutely hire again."

S
Steven D., Huntington
★★★★★

"We called expecting to wait days, but they were here the same afternoon. Fair pricing, quality work, and they kept us informed every step of the way."

C
Chris R., Huntington
★★★★★

"Best experience we've ever had with a home service company. On time, on budget, and the results exceeded what we expected. Truly top-notch."

M
Michael M., Huntington
Join 401+ Happy Customers — Call (877) 349-1553

Why Choose Huntington Roofing & Maintenance for New Roof Installation?

Ventilation Design

We calculate intake and exhaust per IRC R806 for every new install. Balanced ventilation extends roof life and cuts energy costs. Most contractors skip this step.

New Construction Specialists

We install new roofs on new builds every week. Our Huntington crews know the pace, the coordination, and the quality standards that new construction demands.

Builder Coordination

We work directly with your GC on scheduling, staging, and inspections. On-time delivery and clean work that doesn't slow down the rest of the build.

Code Compliance

Every installation meets IRC building code and local Huntington amendments. Proper underlayment, ice barrier, and fastener patterns documented for inspection.

New Roof Installation FAQ

Critical. Improper ventilation causes premature shingle aging, ice dams in cold weather, and excessive attic heat in summer. We calculate intake and exhaust per code requirements. Balanced ventilation extends roof life and reduces energy costs.

Yes. We coordinate directly with your GC on scheduling, material staging, and inspections. We've subbed for dozens of builders across Huntington and understand the pace and expectations of new construction.

One to three days for most residential projects. Standard homes are typically done in one day. Larger custom builds or complex multi-material roofs take two to three days. We coordinate timing with your GC.

Have More Questions? Call (877) 349-1553

SAME-DAY APPOINTMENTS AVAILABLE

Protect Your Home — Call Huntington Roofing & Maintenance Today.

24/7 emergency service. Most appointments available within 48 hours.

Call Now — Free Estimate
📞 (877) 349-1553

★★★★★ 5/5 from 401+ Reviews  ·  Licensed  ·  Insured

About Our Huntington New Roof Installation Services

Proper ventilation is the most overlooked element in new roof installation. We calculate intake and exhaust requirements per IRC R806 based on your attic square footage. Balanced ventilation (soffit intake matched to ridge exhaust) keeps your attic cooler in summer and drier in winter, extending roof life and reducing energy costs.

Typical new roof installation in Huntington takes 1-3 days depending on size and complexity. We coordinate with your builder on scheduling, material delivery, and inspection timing. Materials are staged on-site the day before install to keep the project on schedule.

← All Services New Roof Installation in Shirley → New Roof Installation in Thorndike → New Roof Installation in West Wareham → New Roof Installation in Ashley Falls → New Roof Installation in Canton → New Roof Installation in East Bridgewater →
📞